906 Model's Finising Work After Blowing
Blown end joist(Rear door) 1.D/S end joist 2.blown end joist foam and cover plastic |
![]() |
---|---|
Blown end joist(fron door) 1.D/S end joist 2.blown end joist foam and cover plastic |
![]() |
Box 1.foam resistive panner |
![]() |
Wall gap 1.R19 gaps 2.foam gaps |
![]() |
under stairs 1.Cover plastic concrete wall(bottom) |
![]() |
under stairs(no basement) 1.Cover plastic wall |
![]() |
D/S Ducts 1.R19 just ducts |
![]() |
Stail wall(basement) 1.R19 wall 2.Cover plastic |
![]() |
D/S Joist of basement | ![]() |
Blown basic1 1.Cut gas valve(mechanical room) |
![]() |
Blown basic2 1.Cut drain pipes 2.Cut concent 3.Cut Duct |
![]() |
Blown basic3 1.Cut drain pipes |
![]() |
Blown basic4 1.foam resistive pannel |
![]() |
Blown basic5 1.R19 joist |
![]() |
CAUTION |
1. Checkup Foam & gap of walls 2. Checkup Cutting Pipes & Electrical Concents into all walls |